As the manufacturer of welded pipe unit equipment and welded pipe mould, it is our obligation to deliver each welded pipe unit equipment to customers on time with quality and quantity guaranteed. At the same time, we also need to send installation engineers to customers' site for on-site installation and start-up operation debugging, so as to ensure that the high frequency welded pipe unit equipment we hand over to customers is qualified What problems should we pay attention to during the initial installation and operation?
It is very necessary for the initial installation, commissioning and operation of high frequency welded pipe unit equipment, because we can only achieve perfection as far as possible, but perfection does not exist, and it is inevitable that unexpected situations will occur, which needs to be debugged and solved on site.
The following problems should be paid attention to when the equipment of high frequency welded pipe unit equipment is installed and debugged on site. The first is the frequency debugging of high frequency welded pipe machine, because in terms of the power of high frequency welding machine, it is often the same, but the frequency set at work is not the same. This should be carefully debugged on site. If it is found that it is not suitable, it is necessary to replace the relevant components, which has reached the full capacity Frequency setting to meet the needs of customers, which I met at the customer's site. After all, the part of high frequency welded pipe machine is supplied by us, not produced by ourselves.
In fact, it is the debugging of the running direction and the electric control system. There are many cables for the equipment of the high-frequency welded pipe unit. If any one of the cables is wrongly connected or reversely connected, the running direction may be wrong. This is to be debugged and confirmed. When debugging and checking the running direction of the high frequency welded pipe unit equipment, we must pay attention to the position of the horizontal axis step, and keep a certain distance between the step and the slider, so as not to be too close. In case of reverse rotation, there will be reverse tooth torsion between the step and the thread at both ends of the horizontal axis, so we need to replace the horizontal axis.
In addition, after the installation and electric control debugging of the high frequency welded pipe unit equipment, the mold should be installed for trial production, so as to check whether the mold design is appropriate and whether the performance of the high frequency welded pipe unit equipment meets the design needs. After these are tested and qualified, they can be formally handed over to the customer.
Generally, there are not many problems in the equipment of high frequency welded pipe unit, but to do these work, it is necessary to ensure that there is no accident, and even if there is an accident, it can be handled in time, so that customers can feel that our product quality and service quality are relatively good.
Article by: high frequency welded pipe unit equipment welded pipe unit equipment
http://www.fsgxiug.com Foshan Senweltechnology - guanxiugang-gxiug finishing supply
Next : Cooperation between stainless steel pipe welding machine and pipe making mould Back
Home
- [2021.01.13]Effective production spe…
- [2020.08.10]Precautions for ocean tr…
- [2021.04.09]How to reduce the water …
- [2020.04.28]If you are afraid of str…
- [2021.01.09]What kind of maintenance…
- [2021.01.08]How to produce large dia…
- [2020.04.01]What are the materials o…
- [2021.04.07]How to make hole for wel…
- [2020.04.25]Cooling method of weldin…
- [2020.08.05]Keyway processing of sta…
- [2020.04.23]Distribution of water ci…
- [2020.12.31]Several States of Stainl…
- [2020.04.23]Production requirements …
- [2020.08.04]Power driving direction …
- [2021.04.02]How to produce elliptica…
- [2020.03.30]What are the factors aff…
- [2020.12.28]Configuration requiremen…
- [2020.08.04]Stainless steel pipe mac…
- [2020.08.04]The logo marking method …
- [2021.04.01]Straightening frame of w…